Monday 13 August 2018

Summer works in progress


The Hertfordshire quilt finally has another round.  Had very good intentions to get this round done in May, time ran away and it got placed aside.  Summer has been very busy so far, spending time with family and travelling to new places.  We had really good weather and that has been an unexpected bonus.
 A 21st quilt needs to be done as well for September, so that will be my next project. Have the fabrics all ready,  just need to do the applique.

Diane's 2018 Stitch-a-long:
 This is the part for August.
 June and July just above it.
From January to August, what a feat.
This quilt is one which a lady from BC needs to get done, while she is on holiday.  She decided to pop into The Sewing Cafe. They have machine's which one can use and then one pay a flat rate per hour.
The Hertfordshire Quilt:
 The progress so far, the black border strips sewn on.
Last but not least, the round of diamonds and the wide black border is added. This one will be put aside for now, until the 21st Quilt is completed.
Elbow Lake, Alberta.

Linking to:  Esther's Blog

3 comments:

  1. I'm not getting back to my Hertfordshire until winter - just too busy to concentrate on it and want to finish up a few smaller things first.

    ReplyDelete
  2. Thank you for sharing my stitching passion. I also really like the quilt you featured. I must get back to quilting. The heat has kept me away. 😊

    ReplyDelete
  3. Hi Maggie sitting here rugged up and looking at the lake it looks very very cold LOL Your Hertfordshire Quilt is so lovely it must have been hard to put aside. Ive had a great year finishing lots of UFOs and turning them in to flimsies as you call them over your way, but now I have a pile of UFO flimsies to quilt LOL I just enjoyed your rodeo blog and what a surprise to find a quilter food shop LOL That was a real bonus for you, like the cheery on top of the cake LOL Cheers Glenda

    ReplyDelete